Before - This 40,000 sq.
ft. complex of concrete block buildings had numerous areas
where water had penetrated through the block,
causing paint failure.
-
In Progress - Existing paint
is scraped off of the building in preparation for receiving
wall coating treatment
-
Completed Project - A new standing seam metal roof system was
installed, as well as a metal cap to eliminate water in the walls.
After completion of the roof, SOLARGARD HY-BUILD wall coating system
was applied to waterproof the wall and beautify the facility.
-