-
Before - This 3-story, 60,000
sq. ft. building had deteriorating, leaking brick walls
-
Completed Project - Problem
walls were addressed with RPM patching compound and primed
completely. SOLARGARD HY-BUILD in brick-red
color was then applied to restore the original appearance
of the brick. The SOLARGARD system eliminated costly tuck
pointing. In
addition, the south wall proved to be an excellent location
for signage.
-
10-YEAR LEAK-PROOF LABOR AND MATERIAL
WARRANTY direct
from the manufacturer. Click for details
| Wall Coating Systems Examples Menu |
Click on a thumbnail image below to view
an example of our work:
|

Concrete |
Metal |

Block/Stucco |

Brick/Block |

Block
|

Brick
|

Metal |

Stucco |

Block |
Block |
Brick |
|
|
|